Crane Purchase And Installation Problem Solving

Mar 13, 2023

Crane Purchase And Installation Problem Solving
 

The common purchase problems of cranes include: information documents, safety accessories, electrical and control systems, etc. For details, please click "What To Check After Buying A Crane?" to go.
 

Although the above problems are different in different installation teams, it exposes the weak link in the safety management of the lifting machinery installation team, which directly endangers the personal safety of enterprise employees and affects the normal use of equipment.

 

Analyzing the reasons, there are mainly the following points:
 

1 The safety awareness of the installation team is not strong
 

They did not realize that hoisting machinery is special equipment, and the use of hoisting machinery is dangerous.
 

Some management personnel and operators have a weak sense of responsibility, and they do not fully realize that the hidden dangers left over from the installation work will cause casualties to users or the hazards of major equipment accidents.
 

Crane Purchase And Installation Problem Solving

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2 The internal management of the installation team is relatively weak
 

2.1 The quality of personnel is not high.
 

The cultural level and professional skills of the installation team employees vary widely. Some comrades among them are not familiar with the national standards and industry regulations, and lack solid basic skills in the majors they are engaged in. It is difficult for the installation quality to meet the requirements of the national standards.
 

2.2 The management system of the installation team is not standardized and perfect.
 

Some installation teams do not have a strict and meticulous management system in terms of the safety responsibilities of various personnel, self-inspection records, storage and handover of data files, and linking work quality with wages and bonuses, resulting in unclear employee responsibilities and lax discipline. And the phenomenon of low enthusiasm has led to many omissions in the inspection and acceptance of some lifting machinery.
 

2.3 The employees of the installation team failed to report the design and manufacturing defects of the product and the problems found during the installation process to the manufacturer in a timely manner, and a small number of existing problems occurred repeatedly.
 

2.4 A small number of employees in the installation team have poor service awareness and are slow to rectify the problems found during equipment inspection and acceptance, which affects the normal use of equipment in user units.
 

2.5 A small number of installation teams have no safety approval certificate issued by the labor department
 

This situation is more prominent in tower crane installation projects. The resulting consequences are: the installation quality cannot be guaranteed, the inspection pass rate is low; the hidden dangers of accidents increase, and work-related injuries and equipment accidents occur from time to time.
 

2.6 Some installation teams have the problem of "guiding installation"
 

This situation arises because the supply and sales personnel of the enterprise take the method of eliminating the installation project and reducing the user's investment cost when the user lowers the price, so as to achieve the purpose of signing a contract with the user.

 

 

Misschien vind je dit ook leuk